Odoo Manufacturing (MRP) manages the whole production cycle, from setting up the bill of materials (BoM) to the execution of manufacturing orders, from work centre planning to delivering finished products to stock. It integrates with Inventory (consumption of components and receipt of finished goods), Purchase (replenishment of components and subcontracting) and Accounting (recording of production costs). This article describes what the module covers, how it is configured, which mistakes recur most often and how to decide between standard, configuration, integration and custom development. It refers to Odoo 20 Enterprise.
When an implementation is healthy
A manufacturing implementation works when five conditions hold:
- every manufactured item has a bill of materials that reflects the real production recipe;
- manufacturing orders come from demand (sales orders or reordering rules) and are not created by hand, in isolation;
- work centres and work orders give real-time visibility of the department's load and progress;
- component consumption is recorded in Odoo at the moment of production, not estimated at month end;
- production costs (materials, labour, overheads) flow automatically into inventory valuation.
The module covers seven areas: bills of materials (product recipes, kits, multiple levels), manufacturing orders (execution), work centres (machines and stations), work orders (operations inside a production), the Shop Floor (interface for operators on tablets), subcontracting and the MPS (master production schedule).
The basics of the module for production people
People working in production move between planning, execution and reporting views.
| View | Use in production |
|---|---|
| Kanban | Production overview: orders by stage with remaining time, component availability, status of child orders; work order Kanban for assignment |
| List | All orders with scheduled dates, products, quantities, statuses: multiple actions |
| Form | A single order: components tab, work orders tab, cost summary |
| Gantt and planning | Scheduling of work orders on the centres over time (capacity, automatic rescheduling with buffer) |
| Graph | Production analysis: output by product, delays, OEE trend |
| Pivot | Component consumption by period, cost variances by order |
The Production overview (home screen) shows the pending orders by status. In a healthy implementation Confirmed orders are scheduled in the future and those In progress correspond to today's load, not to a backlog of overdue and unfinished orders.
Some filters are used every day. On manufacturing orders: status (draft, confirmed, in progress, done), scheduled date, grouping by product or work centre. On bills of materials: type (manufacture, kit, subcontracting), grouping by product category. On work orders: status (waiting, ready, in progress, done, blocked), grouping by work centre to see the load. On components: availability, to see the orders blocked by missing components. Favourites are saved for recurring views: "Orders scheduled this week", "Work orders in progress today", "Orders waiting for components".
Every order and every BoM has a chatter. The internal note is for production problems, quality deviations and rework decisions, and is the internal audit trail. The message alerts purchasing to a missing component or quality to a stoppage. The activity chases a blocked order or reminds the technician to update a BoM after a process change. An example: an order is blocked because a batch of components did not pass the quality check. The production manager notes "Batch 2024-089 in quarantine, awaiting quality release or replacement", schedules a "Phone call" activity for the quality manager and notifies the purchasing manager with a mention so they look for emergency stock if the batch is rejected.
The principles of manufacturing in Odoo
The bill of materials is the single source of truth
The bill of materials says what is needed to produce one unit of finished product. In the Components tab it lists each component with its quantity (for example two units of component X, half a kilo of Y, one of Z). In the Operations tab, if work orders are enabled, each operation is tied to a work centre with its duration: assembly on line 1 in thirty minutes, testing at the test bench in fifteen, packing in ten.
If production uses a different ratio of components from the one in Odoo, it is the BoM that is wrong, not production. Keeping it aligned with the real recipe is a maintenance discipline, not a one-off setting.
Orders come from demand
The correct flow ties manufacturing orders to the company's demand. With the make to order route the confirmation of a sales order automatically creates the manufacturing order for the quantity sold. For make-to-stock production, when the forecast stock falls below the minimum, the scheduler creates the order by itself. The manual order is fine for prototypes, rework, samples and non-standard production, not for the routine production of catalogue products. If every order is created by hand by the planner reading a spreadsheet, Odoo works as an archive and not as a planning tool.
Work centres define capacity
They represent physical machines, lines or stations and their configuration drives scheduling. The fields that affect planning are the working hours (when the centre is available: shifts, maintenance windows), the capacity (how many work orders can run in parallel), the OEE target (expected efficiency), the time efficiency (ratio between actual and expected time from historical data) and the hourly cost (used in the order cost calculation).
A centre configured for 24 hours a day when it works eight hours a day produces a useless schedule: every order seems schedulable at any time and capacity warnings never fire. In Odoo 20 the work order planning view keeps dependent orders in sequence when one is moved. Reschedule automatically (keep buffer), the default, preserves planned pauses such as curing time; Reschedule automatically (use buffer) compresses them to meet a deadline; Reschedule manually leaves full control and flags the conflicts for Replan.
Component availability is checked before confirming
Confirming an order without components available creates a "Waiting" status that blocks the department. The correct way: from the order form you use Check availability. Available components are reserved automatically from stock; missing ones put the order in Waiting for components, which starts replenishment if reordering rules exist, otherwise a manual purchase order is needed. Orders are confirmed only when components are available, or when the timing allows delivery before the start. A department where operators begin production and discover halfway through assembly that parts are missing has a planning defect, not an inventory one.
The BoM type determines the production model
Odoo has three BoM types with very different behaviours. Manufacture is the standard BoM: it creates orders, consumes components and puts the finished product into stock. Kit creates no order: on delivery the kit is automatically broken into its components; it suits kits assembled to order and shipped as sets of components and spare parts kits. Subcontracting entrusts a subcontractor with producing the finished product: Odoo sends them the components and receives the finished products, for outsourced production or work done for third parties.
Using "Manufacture" for a product that should be a kit means creating an order for every sale of the kit, a pointless burden. Using "Kit" for a product that requires real internal production means no production tracking.
Configuration
Bill of materials. The header has the finished product, the type (Manufacture), the quantity (the BoM always defines the quantity for one unit, unless it is per variant) and, optionally, a cycle that links a set of operations. A multi-level example: finished product A contains a semi-finished product B in two units, which has its own BoM and therefore generates a child order, made up of a raw material C of one kilo and a component D in three units; then a component E and a packaging F. For multi-level BoMs Odoo can create the child orders for the semi-finished products by itself, if they have their own BoM of type Manufacture. Lead times must take the semi-finished products' production time into account.
The Odoo 20 options relevant to gap analysis are three. The Batch size: if demand exceeds the batch size, the order is split into several orders (manual splitting uses a Maximum batch size). Continuous production (Miscellaneous tab): partial quantities pass to the next work order before the whole order is finished, for assembly lines, waves or constant flow. The replacement of a component across many BoMs in bulk, from the BoM list filtering by component or from the component's product form, and the BoM comparison from the Actions menu.
Work centre. An example: name "Assembly line 1", code AL1, working hours "Day shift" (Monday to Friday 06:00 to 14:00), alternative "Assembly line 2" (used if AL1 is saturated), time efficiency 90 per cent (actual time equals planned divided by 0.9), capacity 1 (parallel work orders), OEE target 85 per cent, costs 45 euro an hour (operator and machine depreciation). Alternative work centres let the scheduling divert automatically when a centre is saturated: without them, capacity constraints stay invisible until the order is late.
Production steps. One step: confirm, produce, validate; components are consumed on validation, with no intermediate tracking. It suits simple products, low volumes, no intermediate quality control. Two steps: confirm, component picking (internal transfer), produce, validate: components are moved from the warehouse to the production area before starting, for large warehouses with components in distant locations. Three steps: confirm, picking, produce, storage of finished goods (internal transfer): finished goods are put in transit before entering the main stock, for production areas physically separate from the warehouse.
Subcontracting. The BoM type Subcontracting is set and in the Subcontractors tab the supplier who does the work is chosen. The flow: a manufacturing or sales order triggers the subcontracting demand; Odoo creates a purchase order to the subcontractor; the components are sent to them (delivery Subcontractor replenishment); the subcontractor produces and ships back; the receipt is validated and the finished goods enter stock; the subcontractor's invoice is treated as a vendor bill.
MPS (master production schedule). It is used when production must be planned by hand per period (week or month): demand is defined per period and product (from sales forecast or manual entry); the MPS shows demand, confirmed orders and suggested replenishment; the planner corrects the quantities and approves; the approved quantities generate the orders. The automatic scheduler suits make-to-stock production with reordering rules and is reactive. The MPS suits seasonal demand, capacity-constrained production and project production (ETO).
The flows
Standard execution of an order. Demand arrives (sales order or reordering rule scheduler) and the order is created in draft. With Confirm the components are reserved from stock (status Confirmed, or Waiting if some are missing). With Check availability all components are reserved. With work orders enabled, from Shop Floor or from the Work orders tab you use Start for each operation, the timer starts, the operator records time, quantity and notes (Record quantity or lot) and closes each operation with Done. With continuous production on the BoM, partial quantities unlock the next work order. Without work orders, from the order form the quantity in production is updated and Produce is used. Component consumption is recorded, actual against planned, the finished goods enter stock (in Stock or through an internal transfer), the order cost is calculated (materials and work centre costs) and accounting posts the entries between the production account and the inventory account.
Scrap in production. During production a component or a semi-finished product is damaged: from the order form you use Scrap, choose product, quantity, lot or serial, the scrap transfer is created, the product goes to the virtual scrap location and accounting records the loss between the inventory account and the scrap account. The order can continue with the remaining stock or start replenishment.
Backorder. An order of 100 pieces of which 80 are produced in this pass: with Produce and quantity in production 80, Odoo suggests "You produced less than the initial demand". With Create backorder a new order is created for the 20 pieces (reference of the original with suffix -002); otherwise production is closed at 80 and the remaining demand is not met. The Consumption warning windows on partial and full production offer Confirm (keeps the consumed quantities) or Update quantity and validate.
By-products. If production generates secondary outputs (sawdust, offcuts, co-products), in the BoM's By-products tab product, quantity and location are added. When the order is validated the by-product enters stock by itself and its value is credited to the production cost.
What changes with Odoo 20
Odoo 20 Enterprise is the reference. Before classifying a need as development (Studio or custom), it pays to test it against these functions.
- Continuous production (BoM, Miscellaneous tab): recording a partial quantity on a work order unlocks for that quantity the next dependent order, so a line keeps flowing without waiting for the entire quantity. The quantities produced enter stock when the order is complete and any remainder follows the backorder flow.
- Batch size on the BoM: if demand exceeds it the order is split into several orders.
- Replacing a component across several BoMs from the BoM list (filtering by component) or from the component's product form; BoM comparison from the Actions menu.
- Production overview. The order Kanban shows the remaining time by stage, a status progress bar, the active work centre and the status of the child orders of semi-finished products; it is grouped by product, status, material availability, date or deadline.
- Work order planning (Manufacturing, Planning, Work orders): a Planning view with Plan order, a # to schedule list, Reschedule automatically (keep or use buffer) or Reschedule manually, and Replan to resolve dependency conflicts; a Kanban view to assign employees and change the status. It replaces the old Planning by work centre and Planning by production menus.
- Renamed items. Produce all becomes Produce; in Shop Floor Record production or serial becomes Record quantity or lot; producing less than planned opens You produced less than the initial demand (Create backorder) and Update quantity and validate aligns the components consumed.
- Tracking on the manufactured product: it is set with the single Tracking field (by lots, by unique serial number; None is untracked) and a Generate serial number step on the work order records the production on the form.
- Allocation report moved to Inventory, Reporting, covers units arriving from purchase and from production.
- PLM. Engineering change orders are created from Shop Floor and compare changes and costs. The change order types have two defaults (Product revision, New product introduction) with customisable stages and approvals; Apply changes in a closing stage asks whether to increment the product and BoM version, archives the old one and activates the revised one; BoMs are compared by component quantity.
- Quality. Control points have a Partial transfer test as a percentage; the supplier's quality rate (percentage of checks passed on incoming transfers) can be seen from the supplier, from purchase orders and from the control point.
For development requests the guidance is this: advanced department dashboards, manual capacity reports, MPS on spreadsheets, workarounds for line flow, bulk BoM changes in Excel and custom workarounds for lots and serials are tested first against the standard functions of MRP, Planning, PLM, Quality and Inventory in Odoo 20.
The justifications you hear
| In the company they say | In reality |
|---|---|
| "We create the BoM once and don't update it, engineering changes go in a document" | The BoM is the contract of production. An old BoM means wrong consumption, costs and purchase plans. |
| "We create all orders by hand at the start of the week" | Automatic generation of orders from demand exists. Manual creation is a bottleneck that grows with volume. |
| "We don't use work orders, operators just tick Done on the order" | Without work orders there are no department times, capacity planning per operation, OEE reports or data on operators' performance. |
| "Work centres are 24 hours a day because it's simpler" | Scheduling sees infinite capacity. No capacity warning ever fires and the scheduled dates on the orders mean nothing. |
| "We write components on paper and enter them in Odoo at month end" | Consumption is thirty days old. Reordering rules work on wrong forecast quantities and order costs are wrong until reconciliation. |
| "We manage subcontracting outside Odoo, we only enter the invoice" | The components sent to the subcontractor are invisible in Odoo. The receipt of finished goods is a manual entry. Traceability of outsourced production is nil. |
| "We use the kit BoM for everything because it's simpler" | Kits do not create orders. There is no production tracking, work order execution or reservation of components at the time of production. |
| "The MPS is too complicated, we plan in Excel and confirm orders by hand" | The MPS is a two-column view inside Odoo. If Excel seems easier, the MPS has not been shown to the planner. |
Warning signs
- BoMs not updated after engineering changes: the Odoo recipe departs from the real process.
- Orders created by hand for all catalogue products: no link between demand and planning.
- Work orders not enabled: no tracking per operation, no department visibility, no OEE data.
- Work centre hours set to 24 hours a day: capacity planning means nothing.
- Component consumption entered at month end instead of at the moment of production.
- Orders often in "Waiting for components": replenishment does not start early enough or lead times are not configured.
- Subcontracting managed outside Odoo: no traceability of components, no integration of the receipt.
- No lot or serial on orders for products that require traceability: the link between the production lot and the components' lot is broken.
- BoM quantities never checked against actual consumption: the cost variance always remains "unexplained".
- Scrap recorded outside Odoo: inventory and accounting do not reflect real losses.
- Multi-level BoMs not configured: semi-finished products are treated as purchased components even when they are produced internally.
- MPS not used for seasonal or capacity-constrained production: demand peaks are solved at the last minute by hand.
- OEE report never reviewed: machine stoppages and efficiency losses invisible to management.
How to check a configuration
After configuring or assessing manufacturing, the check goes through these controls:
- all manufactured products have a BoM of the correct type (Manufacture, Kit, Subcontracting);
- the BoM quantities reflect the real recipe, including scrap factors where needed;
- multi-level BoMs are configured for products with manufactured semi-finished products;
- work orders are enabled and every BoM has operations linked to configured work centres;
- the work centres have correct hours (shifts), capacity and efficiency;
- alternative centres exist where there is parallel capacity;
- the production steps (one, two or three) match the physical layout;
- orders are created automatically from demand (sales order with make-to-order route, or scheduler with reordering rules);
- Check availability is used before confirming orders and shortages start replenishment;
- component consumption is recorded at the moment of production and not afterwards;
- the subcontracting BoMs are configured and the flows for component replenishment and receipt of finished goods have been tried;
- by-products are configured on the BoMs where there are secondary outputs;
- production scrap uses Odoo's Scrap function and not manual inventory adjustments;
- the order cost summary is reviewed: materials and work centre costs match the expected production cost;
- an OEE baseline is established and the centres' efficiency is monitored after the start.
Standard, configuration, integration or custom development
To compare the current process with what Odoo covers without customisation, the starting point is knowing what is standard: the bill of materials with components, variants and by-products; work centres with capacity, efficiency and OEE monitoring; manufacturing orders with step-by-step work orders; the MRP scheduler, that is demand-driven production planning; lot and serial traceability in production, upstream and downstream; scrap management with an impact on the cost of the manufactured product; subcontracting (sending components to the supplier, receiving finished goods); kit BoMs for assembly to order without the load of manufacturing orders; continuous production between dependent work orders and automatic splitting by batch size; the production overview Kanban and work order planning with automatic rescheduling.
Six questions help classify every gap before asking for a development:
- How are bills of materials managed today? Where do they live, whose are they, how are they versioned? BoMs in spreadsheets or PDFs are standard. An external PDM or PLM system is an integration.
- How is a manufacturing order created and scheduled? By hand by the planner, triggered by sales orders or driven by stock? A manual process is configuration, solved by MRP's replenishment routes. The absence of scheduling is configuration and a process change.
- How are work centres and capacity managed? Is there a department planning tool? No tool is standard. Finite-capacity scheduling with Gantt is configuration (centre capacity). Advanced APS scheduling is probably an integration or custom.
- How are scrap and rework recorded? By hand, on a sheet, in the production system? Manual is standard, solved by Odoo's Scrap function.
- Is part of production subcontracted? How is the hand-over managed, are components tracked, are finished goods received? Untracked subcontracting is standard, solved by the Subcontracting BoM type.
- What traceability is needed? Regulatory (food, pharmaceutical, medical), customer request or internal quality? Regulatory traceability is configuration (lots and serials). Advanced quality management is configuration (Quality module). GMP or GxP may require custom development.
The typical classification of the most common cases is this:
| Frequent gap | Typical path | Signs that push towards custom |
|---|---|---|
| BoMs in Excel | Standard | An external PLM system with hundreds of BoM versions to synchronise in real time |
| Manual production scheduling | Configuration (MRP) | Advanced finite-capacity scheduling across several plants |
| Line flow blocked until the entire quantity finishes an operation | Configuration (continuous production) | None |
| Replacing a component BoM by BoM | Standard (bulk replacement across several BoMs) | None |
| No tracking of work centres | Standard | OEE integration with physical SCADA or MES systems |
| Scrap not tracked | Standard | Statistical process control with SPC charts |
| Subcontracting not tracked | Standard | Complex multi-level subcontracting with customs documentation |
This article is an OIAR skill
What you have just read is the content of a skill from the OIAR catalogue, written for people. Knowledge like this, but richer and deeper, written for the agents, drives the interviews, the analysis and the report inside the platform. Skills are used in OIAR: to try this one on a project of yours you need an account.
odoo-mrpA guide to designing and checking the Odoo 20 Enterprise Manufacturing (MRP) module: bill of materials, manufacturing orders generated from demand, work centres and work orders, component availability check, BoM types (manufacture, kit, subcontracting), MPS, scrap and by-products, continuous production. It contains the warning signs, the justifications heard in companies and the questions for deciding between standard, configuration, integration and custom development. It is needed when setting up or checking manufacturing in Odoo, with or without interviews with production and plant managers.